PLZ12005WH/PLZ20005WH Electronic Load

Commnunication Interface Mannual


 

Tutorial

Waiting for Operation Complete

When the *OPC command is transmitted, the PLZ12005WH/PLZ20005WH sets the OPC bit (bit 0) of the event status register to TRUE (1) when the processing of all commands in standby has been completed. This information can be determined by checking the OPC bit (bit 0) of the *ESR? query.

Example: Starting a new measurement and transmitting the *OPC command

When the Event Status Enable Register is set to 1 and the Service Request Enable Register is set to 32, an SRQ (Service Request) is generated upon measurement completion. The SRQ function cannot be used if you are using the RS232 and SCPI-ROW interfaces.

*ESE 1;*SRE 32;*CLS;:INIT:ACQ;*OPC

<A service request is generated upon completion of measurement>

When the *OPC? request is used instead of the *OPC command, the PLZ12005WH/PLZ20005WH sets response data “1” (in NR1 format) in the output queue upon completion of measurement if there are no other operations waiting to be completed.

:INIT:ACQ;*OPC?

<Read response upon measurement completion>

When IEEE488 sdc/dcl, *RST, or *RCL is transmitted when the power is turned on, the PLZ12005WH/PLZ20005WH sets the OPC bit (bit 0) to TRUE (1), and the response data in the output queue to “1” (in NR1 format).

Setup

Overview of Command

Command (function search)

Command (ABC search)

Command (Sub-system search)

Register

Appendix

Tutorial

Electronic Load  PLZ12005WH/PLZ20005WHElectronic Load PLZ12005WH/PLZ20005WH
Communication Interface Manual